C.S. Mott Children’s Hospital
The C.S. Mott Children’s Hospital project entailed the demolition of some existing structures, additions/improvements to other existing facilities, and the creation of two new facilities: a family hospital and a medical office building.
Services Provided:
- BIM Modeling
- 3D Coordination
- Installation Drawings for Pneumatic Tubing Contractor
- Weekly On-Site Meeting Attendance to Coordinate with Other Trades
Share
Related items
Caleffi – 6000 – LEGIOMIX® Electronic Mixing Valve
Product Description: LEGIOMIX® is an advanced electronic mixing valve with digital control of temperature for…
Silver Cross Hospital
The new six-story, full-service hospital replaced the existing facility, using construction focused on ‘evidence-based design’…
Caleffi – Z-One™ Zone Valves
Product Description: Z-one™ valves are used to automatically shut-off the flow or redirect hot and…
Caleffi – NA5453 – DIRTMAG® – Dirt Separator with Magnet for Vertical or Horizontal Pipes
Product Description: The DIRTMAG® low-velocity zone dirt separator with magnet efficiently removes particles to a…